In Situ Stabilizaton

Prior to the in situ stabilization (ISS) approach, the remediation areas required extensive preparation involving the removal of subsurface piping, utilities, deep piling, monitoring wells, surficial and underground reinforced concrete structures as part of the previous manufacturing facility at the site. 

Download the project highlight to learn how Cascade remediated over 63,000 cubic yards to 60 feet below ground surface. 