Remediation

At a former manufacturing facility, subsurface contamination needed to be addressed--but a lot of preparation was needed. Below ground pipes, utilities, deep piling, monitoring wells and more needed to be removed before remediation could begin. Additionally, asbestos containing materials (ACM) were known to be present, requiring full-time asbestos monitoring oversight and ambient air sampling.

To learn how Cascade crews tackled these challenges and implemented an ISS solution, download the project snapshot.